PROJECT NAME: Lombard (US30BY) at OR99E (MLK)
PROJECT TYPE: ARTS Hot Spot
AGENCY: ODOT
PROPOSED SOLUTIONS:

  • Add two new luminaires, one on each approach, to existing utility poles on Lombard
  • Trees need to be trimmed along the south side of Lombard on both sides of the intersection
  • Install 125 foot long traffic separator on the west leg of Lombard
  • Install 210 foot long traffic separator on the north leg of MLK
  • Restripe lanes