PROJECT NAME: SE Division St at SE 162nd Ave
PROJECT TYPE: ARTS Hot Spot
AGENCY: City of Portland
PROPOSED SOLUTIONS:

  • Install 150 foot long traffic separator with candlesticks on the north leg of the intersection
  • Restripe northbound lanes to the east of the traffic separator on the north leg of the intersection
  • Install 100 foot long traffic separator with candlesticks on the west leg of the intersection
  • Restripe lanes north or south of the traffic separator on the west leg of the intersection

NOTE: Signal coordination included in ARTS Systemic project on Division, and illumination included in ARTS Bike/Ped Systemic project on Division.

Have a comment? Share it here.