PROJECT NAME: OR99E: MP 13.70 – MP 22.89
PROJECT TYPE: ARTS Systemic – Intersections
AGENCY: ODOT
PROPOSED SOLUTION:

  • Install reflectorized back plates and supplemental signal heads at Territorial Rd, N Redwood St/S Sequoia Parkway, NE 4th Av/Pine St, Ivy St, Grant St, SW Berg Parkway, and SW Barlow Rd
  • Increase size of stop sign, properly place stop bar, and install advance stop ahead intersection striping at Paquet St and South End Rd

Have a comment? Share it here.