PROJECT NAME: OR99W (Barbur Blvd): MP 7.58 to MP 15.00
STIP ID NUMBER: 20440
AGENCY: ODOT
PROJECT DESCRIPTION:

  • Install illumination, reflectorized backplates, and supplemental signal heads at specific locations within the project limits
  • Replace urban permissive or protected/permissive left turns to protected left only at 68th and 69th Avenues

TOTAL COST: $1,450,000
ARTS FUNDING: $1,450,000

Have a comment? Share it here.