PROJECT NAME: US30BY (Lombard): N Peninsular Avenue – N Greeley Avenue
STIP ID NUMBER: 20413
AGENCY: ODOT
PROJECT TYPE: ARTS Hot Spot
MILE POINTS: 3.32 – 4.59
PROPOSED SOLUTIONS:

  • Restripe Lombard from a three lane section to 2 through lanes with a turn lane

At Peninsular Ave

  • Full signal rebuild
  • Upgrade 3 ramps (on the northeast, northwest and southwest corners) to current Americans with Disabilities Act standards
  • Close east crosswalk and install barricade and sign

At Greeley Ave

  • Full signal rebuild
  • Upgrade 3 ramps (on the northeast, southeast and southwest corners) to current Americans with Disabilities Act standards
  • Close west crosswalk and install barricade and sign

TOTAL COST: $1,824,900
ARTS FUNDING: $1,824,900
Note: This project was leveraged with the Lombard Safety Extension State Highway System Leverage project. The Leverage project, two Operations projects (Lombard at Fiske and Lombard at Chautauqua) and one Safety/ARTS projects (Lombard at Peninsular and Greeley) were combined for the purpose of project delivery.

Have a comment? Share it here.