PROJECT NAME: US26: Middle Fork Salmon River Culvert
STIP ID NUMBER: 20362
MILE POINTS: 57.7
ISSUE: This culvert has been identified as in need of repair or replacement from either ODOT’s Drainage Facility Management System or the Bridge PONTIS system. Culvert issues range from rusted out inverts and sides, open joints, cracking, general barrel damage and partial collapse of the structure.
PURPOSE AND NEED: Culverts in critical or poor condition states have a high potential of failure which would pose a significant safety risk to the traveling public and close the highway. This closure would adversely impact mobility and the economy on the surround communities.
PROPOSED SOLUTION: Culvert replacement. This project will fund additional design and construction.
TOTAL COST: $300,000