PROJECT NAME: OR99W: I-5 – McDonald Bike Ped Infill
STIP ID NUMBER: 20437
MILE POINTS: 7.47 – 10.29
PROJECT DESCRIPTION: Fill in sidewalk and bike lane gaps along OR99W in conjunction with the pavement preservation project planned in the area.
TOTAL COST: $986,000
Note: This project was leveraged with the OR99W: I-5- McDonald St project

Have a comment? Share it here.