PROJECT NAME: I-84: East Portland Fwy – NE 181st Ave
STIP ID NUMBER: 20410
MILE POINTS: 6.9 – 12.52
PURPOSE AND NEED: Pavement is rutting. Bringing this section of roadway to fair or better rating will prevent increasing repair costs.
PROPOSED SOLUTION: Remove and replace asphalt surface to repair rutted pavement.
TOTAL COST: $500,000
Note: This project was selected to be part of the ODOT shelf program. The allocated funding pays for the design phase of the project. This approach allows ODOT to have shovel ready projects that will be ready to go to construction once additional funding is available.