PROJECT NAME: I-5: I-205 Interchange – Willamette River
STIP ID NUMBER: 20411
MILE POINTS: 283.21 – 288.5
PURPOSE AND NEED: Pavement is rutting. Bringing this section of roadway to fair or better rating will prevent increasing repair costs.
PROPOSED SOLUTION: Remove and replace asphalt surface to repair rutted pavement.
TOTAL COST: $7,156,351

Have a comment? Share it here.