NAME: I-205: Pacific Hwy – Abernethy Bridge
MILE POINT (Start-End): -0.10 – 8.82.
PRE-SCOPING COST ESTIMATE: $7,700,000
PURPOSE/NEED: Pavement is rutting. Bringing this section of roadway to fair of better rating will prevent increasing repair costs.
PROPOSED SOLUTION: Remove and replace the 2.0 inches of pavement in the travel lanes.

Have a comment? Share it here.