PROJECT NAME: I-205: Abernethy Bridge – SE 82nd Drive
STIP ID NUMBER: 20508
MILE POINTS: 9.31 – 13.8
PURPOSE AND NEED: Pavement is rutting. Bringing this section of roadway to fair or better rating will prevent increasing repair costs.
PROPOSED SOLUTION:  Remove and replace asphalt surface to repair rutted pavement.
TOTAL COST: $5,669,400

Have a comment? Share it here.