PROJECT NAME: I-5: Barbur Blvd NB Connection Bridge
STIP ID NUMBER: 20465
BRIDGE NUMBER: 07758D
MILE POINT: 7.82
ISSUE: Bridge in need of painting due to rust and existing paint failure.
PURPOSE AND NEED: The bridge is on an National Highway System (NHS) designated route. The bridge will continue to deteriorate requiring costly maintenance. Deteriorating conditions could lead to significant mobility impacts.
PROPOSED SOLUTION: Paint structure; remove pack rust. Replace rivets and bolts.
TOTAL COST: $1,669,975

Have a comment? Share it here.