PROJECT NAME: I-405: Willamette River (Fremont) Bridge
STIP ID NUMBER: 20481
BRIDGE NUMBER: 02529
MILE POINT: 3.32
ISSUE: Large project with top coat peeling and some rusting.
PURPOSE AND NEED: The bridge is on an National Highway System (NHS) route designated for freight. The bridge is a high value bridge due to its length and since it crosses the Willamette River. Bridge will continue to deteriorate requiring costly maintenance. Deteriorating conditions could lead to mobility impacts.
PROPOSED SOLUTION: Paint bridge approaches and other sections as funding allows
TOTAL COST: $30,854,891

Have a comment? Share it here.