PROJECT NAME: I-84: NW Forest Lane over I-84
STIP ID NUMBER: 20485
BRIDGE NUMBER: 08634
MILE POINT: 46.35
ISSUE: Low vertical clearance on I-84 Eastbound
PURPOSE AND NEED: Increasing vertical clearance on the interstate improves safety since large loads do not have to travel on two-lane highways. Also, detours are minimized, which is especially important in winter when the detour routes can require traveling through mountainous regions.
PROPOSED SOLUTION: Increase vertical clearance by 4 inches
TOTAL COST $1,431,123