PROJECT NAME: I-405 NB to US26 WB over I-405 Connection Bridge
STIP ID NUMBER: 20482
BRIDGE NUMBER: 09254E
MILE POINT: 1.57
ISSUE: There are cracks with rust staining on the bottom of the box girders. If the cracks are not sealed, water will continue to get into the box girders and cause deterioration.
PURPOSE AND NEED: The deck is in fair condition, with one exposed reinforcing bar in the deck, along with unsealed cracks that are of moderate size and density, and some larger cracks.
PROPOSED SOLUTION: Deck overlay to seal the cracks and provide additional cover for the reinforcement. Rail retrofit. Address leaking joints.
TOTAL COST: $1,548,226